Friday, 25 April 2014

Portal Kementerian BUMN | Direktori BUMN

Visi Kementerian BUMN : "Meningkatkan peran BUMN sebagai instrumen negara untuk peningkatan kesejahteraan rakyat berdasarkan mekanisme"

Achievements

Activity

April  2014
Mon Tue Wed Thu Fri Sat Sun
   
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30  

Kontak Kami

pic

Polls

Sorry, there are no polls available at the moment.

Rencana Kerja

Rencana Kerja
Environment Conservation

Periode : year,2007 -

Description :

Basically in Adhi’s business line there is no fabrication which has any direct effect on the environment conservation. However, the Company keeps making efforts to minimize the polluting effect from the operation of construction equipment by applying the K3L (Industrial and Environmental Safety and Health) Management System.

Target :

HRD Development

Periode : year,2007 – 2007

Description :

- With the Company’s HRD systems available, for the year 2007 the Company makes a plan for domestic and overseas education and training, especially to meet personnel requirement in project management and engineering areas.
- Reviewing the HRD system and preparing training programs to meet the competence and skills requirement in accordance with the Company’s needs.
- Carrying out a corporate value alignment program for all the Company’s personnel.

Target :

Marketing

Periode : year,2007 – 2007

Description :

- Collecting market information data on a routine basis from all sources by periodically evaluating the probability.
- Developing engineering markets by seeking partners for joint operations.
- Establishing relationships with prospective investors.
- Increasing the capability in the project bidding estimation.
- Consolidating the overseas market penetration, mainly in Mediterranean countries.
- Enlarging the infrastructure market segment in potential areas.
- Initiating market penetration and diversification.
- Taking follow-up measures on the results of customer satisfaction surveys.
- Promoting the brand image through product quality and service improvement.
- Providing EPC/CSP projects with FS to attract investors.
- Conducting and taking follow-up measures on the customer satisfaction surveys to identify the customer’s perception of the Company’s services.
- Making customer need analyses.

Target :

Production and Product Quality

Periode : year,2007 – 2007

Description :

- Developing a technical support system (database) and preparing project management training modules.
- Improving the cost, quality and time control by providing project management training for the entire project.
- Making efforts to optimize the inter-working unit (interdepartmental) synergy.
- Applying the K3L management system according to the OHSAS 18001:1999 and SMK3L (Safety and Health Management System) standards.
- Applying consistently the quality management system according to ISO 9000:2000 standard.

Target :

Technical and Technology

Periode : year,2007 – 2007

Description :

- Cooperating with specialists from universities, among others in project planning and implementation.
- Cooperating with specialists from Technical Department to conduct a feasibility study in the fields of road, clean water, seaport and airport as part of CSP strategy implementation.

Target :